JT Glazing Metal Works Pte Ltd Get a quote
WhatsAppGet a quote

Single leaf, double leaf and fixed panels. With valid Certificate of Conformity.

Get a quote
Finished work

Rated for fire. Clear as day.

Office entrance: fire rated glass with stainless steel capping finish
Office entranceStainless Steel capping
Corridor screen: fire rated glass with stainless steel capping finish
Corridor screenStainless Steel capping
Terrace doors: fire rated glass with powder coated finish
Terrace doorsPowder coated
Corridor door: fire rated glass with powder coated finish
Corridor doorPowder coated
Furnace testJT glass door system mounted in a fire-test furnace before the testThe same door system glowing during the furnace test
Fire test

Two hours of fire. Still closed.

000minIn the furnace
1-hour system2-hour system
1 hr2 hr

Scroll to run the clock. Each system is furnace-tested for its full rated time: 1 hour, or 2 hours.

Certificate of Conformity

With valid Certificate of Conformity.

All of our door and fixed panel systems comes with a valid COC under the Product Listing Scheme. Without this COC label given and fixed on the door and fixed panel systems, the door and panel systems are not a valid, approved fire rated insulated product.

COC serial label pasted after checking: PLS serial label on the narrow movable sash edge inside the door and frame gap, about 150 to 300 mm below the top
Products

Glass only. Two ratings.

Full specs
Glass door system
01

Glass door system

Single leaf or double leaf, in a 1-hour or a 2-hour system.

1-hour60 minutesCOC under PLS
2-hour120 minutesCOC under PLS
  • LeafSingle or double
  • FinishPowder coated or Stainless Steel capping
Fixed glass panel
02

Fixed glass panel

Fixed fire rated glazing that keeps the sightline, in a 1-hour or a 2-hour system.

1-hour60 minutesCOC under PLS
2-hour120 minutesCOC under PLS
  • BuildSteel-framed
  • FinishPowder coated or Stainless Steel capping
Finishes
03

Finishes

Two finishes, both on the same certified systems.

  • Option APowder coated
  • Option BStainless Steel capping
  • GlassClear, fire rated
  • TimberNever
Anatomy of a door system

Every part is rated.

Tap a point on the door.

  • Clear glazing rated with the door system, for 1 or 2 hours. It stays in the frame while the fire is on the other side.

  • A steel frame, powder coated or finished with Stainless Steel capping, like this one.

  • Seals that swell with heat and close the gaps where the door leaf meets the frame.

  • Lever handles, hinges and locks that belong to the certified system, not off the shelf.

  • The fixed glass panel above is part of the same rated door system, so the whole opening holds.

Double fire rated glass doors with Stainless Steel capping and a glazed transom
Before and after

Same exit. Now clear.

A solid steel exit door, replaced with fire rated glass. Drag to compare.

Before: solid grey steel exit door
After: fire rated glass exit door showing the staircase
BeforeAfter
Install protocol

Four steps. No shortcuts.

12
Hours, set by the Fire Code
01Specify

Match the rating

The Fire Code sets the rating for each opening. We confirm 1 hour or 2 before anything is made.

Close-up of an intumescent seal set into a brushed steel frame beside the glass edge
02Install

Fit to the system

Frame alignment, clearances, fixings and perimeter seals, exactly as the certified system specifies.

03Test

It must close itself

The self-closer has to shut the door fully, from any angle, over the latch. Every time.

COC serial label pasted on the door edge after checking
04Certify

Label and hand over

The COC label is given and fixed on the door or fixed panel. Without it, the system is not a valid, approved fire rated insulated product.

Questions

Straight answers.

Do you make timber fire doors?

No. JT does glass only: fire rated glass door systems and fixed glass panels.

Which ratings do you supply?

1-hour and 2-hour door systems and fixed panels, matched to what the Fire Code requires at each opening.

How do I know a door is certified?

It must come with a valid Certificate of Conformity (COC) under the Product Listing Scheme, and the COC label must be given and fixed on the door or fixed panel. Without this label, the system is not a valid, approved fire rated insulated product.

Can a solid fire door be replaced with glass?

Often, yes. That is the before and after above. We confirm the rating that opening needs first.

Who is behind JT?

JT Glazing Metal Works Pte Ltd works alongside its sister company Dengya Glass, in glass supply and installation since 2006.

Quotation

Need a door that passes inspection?

Send a photo of the opening. We'll tell you the rating it needs and what it takes. Every door comes with a valid Certificate of Conformity.